Project information:

Architect:  Hoffman Architects PA

Contractor:  Cutler

PCSB Project Coordinator: Brian Long

Project Budget: $9.8 Million

Start Date: July 2017

Completion: August 2019

 

Construction/Renovation of:

Exterior Renovation to include:

  • Update Exterior front of campus
    • stain brick on buildings 1, 3, and 5 to have a uniform look
    • update main entrance to building 1 with a more identifiable entrance
  • Paint exterior of all buildings

Classroom Buildings 3 and 4

  • Replace windows.

Auditorium: Building 5

  • Update the lobby entrance with new finishes throughout
  • Add plywood floor on stage and paint black
  • Infill full height windows on the north walls of the auditorium
  • Replace the operable walls in the auditorium with new operable walls
  • Replace the acoustical panels throughout auditorium
  • Repaint interior auditorium throughout
  • Replace ceilings and lights (lights to be LED)

 Courtyard:15,340 square feet

  • Remove existing overhangs and bring new atrium roof to the edge of existing walls
  • Atrium to be a 2 story space that matches the height of building 4. The Roof and rooms 608-610c in building 1 will be removed.  The Atrium will cover the hallway between buildings 1 and 2 and the open space between buildings 1, 2, 6, and 7.  Roof removal is at expansion joints.
  • Convert room B1 107G (lockers) into secondary serving line for cafeteria, provide power requirements as needed.

New gym lobby addition to be an estimated 3,900 square feet: Building 7

  • New gym lobby to have concession stand at an estimated 400 square feet
  • New restrooms in gym lobby to be an estimated 800 square feet
  • Gym lobby custodial closet to be an estimated 65 square feet
  • New ticket booth at an estimated 60 square
  • New trainer’s room at an estimated 140 square feet
  • New trophy cases

New wrestling room to be an estimated 3,000 square feet: South Side of Building 7

  • Current wall between weight room and wrestling room to be removed and replaced with storefront system

Renovation of the Gymnasium to include:

  • Replace the HVAC as the chiller is old and will be too small to accommodate the new additional square feet
  • Clean all existing HVAC duct and paint
  • Infill the windows at the end walls with cmu block
  • New basketball goals – make sure each is installed the same distance from the end lines
  • Refinish basketball court
  • Remove lay in ceiling
  • Remove any existing unused electrical conduit on walls
  • Replace lights
  • Refinish bleachers
  • Replace the sound/PA system
  • Add 2 practice basketball goals
  • Install acoustical treatments

Project status:

  • Project is Complete
2016.04.16   Lakewood High School Brochure
2016.04.16   Lakewood High School Brochure1
2016.04.16   Lakewood High School Brochure2
2016.04.16   Lakewood High School Brochure5
2016.04.16  Hoffman Architects
2016.04.16  Hoffman Architects 3
2016.04.16  Hoffman Architects1
2016.04.16  Hoffman Architects2
2016.04.16  Hoffman Architects4
2016.04.16  Hoffman Architects5
2016.04.16  Hoffman Architects7
2016.04.16  Lakewood High School Brochure3
2016.04.16  Lakewood High School Brochure4
2017.12.18 DJI_0022
2017.12.18 DJI_0054
2017.12.18 DJI_019
2018.01.16 DJI_0020
2018.02.12 DJI_0028
2018.02.12 DJI_0030
2018.03.14 DJI_0061
2018.05.18 DJI_0003
2018.05.18 DJI_0011
2018.08.15 DJI_0018
2018.08.15 DJI_0023
2018.08.15 DJI_0026
2018.09.21 DJI_0018
2018.09.21 DJI_0019
2018.09.21 DJI_0024
2018.09.21 DJI_0033
2018.09.21 DJI_0037
2018.09.21 DJI_0038
2018.09.21 DJI_0043
2018.10.25 DJI_0030
2018.10.25 DJI_0035
2018.10.25 DJI_0043
2018.11.13 DJI_0001
2018.11.13 DJI_0014
2018.11.13 DJI_0016
2018.11.13 DJI_0024
2018.12.17 DJI_0001
2018.12.17 DJI_0008
2018.12.17 DJI_0015
2018.12.17 DJI_0016
2018.12.17 DJI_0018
2018.12.17 DJI_0020
2019.01.11_091442
2019.01.11_092020
2019.01.11_092231
2019.01.11_092410
2019.01.11_092430
2019.01.11_092517
2019.01.11_092553
2019.01.11_093128
2019.01.11_093135
2019.01.11_093244
2019.01.11_093305
2019.01.11_093516
2019.01.11_093958
2019.01.11_094110
2019.01.11_094145
2019.01.11_094304
2019.01.11_094413
2019.01.11_094418
2019.01.11_094552
2019.01.11_094600
2019.01.11_094700
2019.01.11_095021
2019.01.11_095138
2019.01.11_095438
2019.01.11_095455
2019.01.11_100035
2019.01.11_100513
2019.01.11_100627
2019.01.11_100709
2019.01.22 DJI_0018
2019.01.22 DJI_0021
2019.01.22 DJI_0023
2019.01.22 DJI_0025
2019.01.22 DJI_0030
2019.02.27 DJI_0015
2019.02.27 DJI_0018
2019.02.27 DJI_0026
2019.04.26 DJI_0010
2019.04.26 DJI_0011
2019.04.26 DJI_0013
2019.04.26 DJI_0017
2019.05.29 DJI_0013
2019.06.21DJI_0020