Project information:
Architect: Hoffman Architects
Contractor: Ajax
PCSB Project Coordinator: John Cooley
Project Budget: $8 Million
Start Date: March 2020
Completion: January 2021
Construction/Renovation of:
Objective is to create a new lobby and renovate auditorium. Renovate/remodel all interior of classrooms and hallways in building 17. Reroof building 17. This project is to include some civil work at the campus in specific areas and waterproofing of stadium bleachers.
New Auditorium Lobby:
- Utilize existing front entrance to create a new lobby with store front. Include new floors, walls, ceilings, lighting, and paint.
- Open bathrooms to be accessible from lobby area
- Bathrooms to be renovated including ceilings, floors, walls and lighting.
- Auditorium to be painted and include new acoustic treatments.
Auditorium roof:
- Auditorium roof to be replaced with new roofing system.
- Roof drains to be added or repaired as necessary.
- All edge metal and caps to be replaced with new sheet metal.
Courtyard
- Re-grading of existing courtyard to remove standing water and correct drainage issues.
Building 17:
- All classrooms and corridors to be renovated including new floors, lighting, and ceilings (tiles and grid)
- Interior to be painted throughout.
- Replace HVAC for entire building
- Reroof building with new roofing system including all roof curbs and parapets, all edge metal and caps to be replaced with new sheet metal.
- Roof drains to be added or repaired as necessary.
Building 26 Media Center:
- Replace lights, ceiling, and flooring
- Remove partitions (like Lakewood HS)
- Check data/low voltage work
Stadium:
- Waterproof stadium bleachers to stop water intrusion to locker rooms and weight room.