Skip To Main Content

2023 Clearwater High School

Clearwater High - Major Renovations

Updated on 9/25/23

Project information:

Architect:  Hepner Architects, Inc.

Contractor: Je Dunn Construction Group, Inc.

CM Project Website: https://www.clearwaterhs.jedunnbuilds.com

PCSB Project Coordinator: Rich Gauvey

Project Budget: $57.5 Million

Construction Start Date: March 2021

Completion: October 2023

Construction/Renovation of:

The project will include new construction, renovation and remodeling of the existing Clearwater High School Campus. The new site plan will include a beautification element along the street edge of Gulf to Bay which the City of Clearwater will be included in the design development.  There will also be a minimum of 25 portables that will be needed to house students during construction.

           Demolition will include

              Buildings 2, 3, 5-17, 22, 32, 34 and 35

          New construction will include:

    • Administration suite w/ multi-use collaborative space
    • Central Energy Plant
    • Cafeteria
    • Media Center
    • Science classrooms
    • General classroom learning suites
    • Entrance to the football stadium along with a new synthetic turf field and track
    • Parking lot layout in the front of the campus and a new location for the driver’s ed course
    • ESE classrooms

     

    Renovations and Remodeling include:

    • Campus to receive new interior and exterior paint throughout for all painted elements.

     

    • Building 4 is to receive minor renovation work to include new interior and exterior paint throughout, new ceilings and lights, and new flooring in the gymnasium lobby.

     

    • Building 18 is to receive a total remodel which would include, but not limited to, new ceilings, lights, flooring, paint, windows and new HVAC.  Building 18 will house the ROTC, Aerospace program, Woodshop and additional classroom space.

     

    • Building 19 is to receive a total remodel which would include but not limited to new ceilings, lights, flooring, paint, and new HVAC.  Building 19 will house the Adult Education program and will have flex space for high school testing lab(s).

     

    • Building 24 is to receive minor renovation work to include new interior and exterior paint throughout, new ceilings and lights and new flooring. The building’s HVAC system is also to be evaluated for life expectancy.

     

    • Building 25 is to receive minor renovation work to include new interior and exterior paint throughout, new ceilings and lights and new flooring. The building’s HVAC system is also to be evaluated for life expectancy.

 

Project status:

Week of 9/18-9/23/23

Site:

  • Landscaping in progress in the courtyard for Buildings 4, 5 and 6
1-20-906-043_Clearwater HS_Hepner Architects
20-906-043_Clearwater HS_Hepner Architects2
20-906-043_Clearwater HS_Hepner ArchitectsCourtyard
20-906-043_Clearwater HS_Hepner ArchitectsCourtyard2
20-906-043_Clearwater HS_Hepner ArchitectsMemorial
20210325_112911
20210325_111726
20210325_110618
20210325_110138
2021.04.02b
2021.04.02
2021.04.02a
2021.04.02d
2021.04.02e
2021.04.02c
2021-5-7Building 7
2021-5-7Building 1
2021-5-7Building 7Footing
2021-5-7Cooling Tower steel
2021-5-7CEP
2021-5-21 Track and Field
2021-5-21 Stem Walls
2021-5-21 CEP Bldg
2021-5-21 B1 Steel
2021-5-21 Football Field Progress
2021-5-21
2021.06.18a
2021.06.18b
2021.06.18
2021.06.18e
2021.06.18d
2021.06.18c
2021.07.16Turf Install and Asphalt Repair at Football Fieldjpg
2021.07.16 Stucco Install at Building 11jpg
2021.07.16 Building 1 Decking
2021.07.16 MEP Install at Building 11jpg
2021.07.16Rough Grade. Preparation for Footings Building 9jpg
2021.07.16Tie Beams .Preparation for Hanging Steel Building 3jpg
2021.11.08 Stucco Install Bldg 1
2021.11.08 Bldg 1 Elevated walkway
2021.11.08 Metal Panel West of Bldg 1
2022.02.21 Aerial
2022.02.21
2022.02.21 Site Photo
2022.02.21 Football Field Aerial
2022.02.21 Football field
2022.04.20
2022.04.20a
2022.04.20b
2022.04.20c
2022.06.15f
2022.06.15g
2022.06.15d
2022.06.15c
2022.06.15b
2022.06.15a
2022.06.15
20221130c
20221130b
20221130a
20221130
Clearwater HS 6-2-23
Clearwater HS 6-19-23
Clearwater HS 6-19-23
Clearwater HS 7-7-23
Clearwater HS 7-21-23 1
Clearwater HS 8-11-23
Clearwater HS 8-18-23
Clearwater HS 9-15-23 1
Clearwater HS 9-18-23 2
Clearwater HS 9-18-23 1
Clearwater HS 9-18-23 3
Clearwater HS 9-18-23 5
Clearwater HS 9-18-23 4
Clearwater HS 9-18-23 6