Project Information:
PCS Project Coordinator: Erin Ellis
Project Budget: $57,000,000
Start Date: March 2025
Completion: August 2027
 
Construction/Renovation of:
The project at Seminole High School includes the following new construction, renovation and remodeling campus wide:
  • Roofing repairs throughout the campus
  • Replacement of one chiller as it is nearing the end of its useful life
  • HVAC – replacing all ceiling-mounted unit ventilators with vertical fan coil units as well as identifying any old HVAC equipment that has reached its useful life and replacing it.
  • Campus electrical distribution throughout
  • Refresh classrooms with paint, ceiling tiles, lighting, roller window shades, also ensure safety tinting film to be placed on all exterior windows, evaluate doors and hardware for replacement and new signage throughout the facility. Replace any smartboards with interactive projectors to make the campus consistent.
  • Cafeteria:  
    •  Demolition of the existing cafeteria building and new construction of an 11,146 sq. ft. dining hall that includes a kitchen, accessory storage areas, cafeteria, serving line and food pantry
    • Outdoor dining/quad: rejuvenate to create a collegiate atmosphere and accommodate the school’s one lunch system
    • Indoor dining room size 6,456 sq. ft.
  • Creation of an entrance to give the campus more of a collegiate feel as well as improve parking and traffic flow
    • Rework the parent drop-off/pick-up to create longer queuing
  • Front Office, Administration Building and Guidance Suite: A complete remodel and change of layout may be needed depending on the design of the new front entrance.  All new ceilings, floors, lights and paint throughout
  • Exterior: repaint, reface and ensure the entire campus has a unified paint scheme
  • Refresh of Media Center: new ceilings, lights, flooring and paint
  • Remodel/relocation of the arts classroom, which is to be placed into the remodeled east dining room
  • Refresh hallways with ceiling tiles, paint, lighting and flooring (selective removal of lockers)
  • Demolish Buildings 9 and 11-14
  • Building 10: remove Hauserman partitions and replace them with new partitions as required
  • Auditorium and Gymnasium: evaluate lighting and have recommendations on replacement or remain as is
  • Music Building
    • Create a vestibule to control unconditioned air from entering the building for the band 
    • Create a stage/performance space for band/chorus performances/practices
  • Add security cameras where needed to ensure the campus has complete coverage (the district will provide locations of inadequacies)
  • Renovate restrooms throughout the entire facility
  • Evaluate plumbing throughout for possible re-coating of water and sanitary lines throughout the campus
    • The district has facility assessments for plumbing scope
Project Status: Week of 9/25/26
  • Fire sprinkler rough-in is complete in Building 29
  • Bathroom ceilings are complete in Building 29
  • MEP rough-in and cloud soffits are complete in Building 29
  • Fire alarm installed in Building 30
  • Light fixtures were installed in Building 30
  • The ADA bus loop ramp is complete
Seminole HS 1
Seminole HS 3
Seminole HS 2
Seminole HS 4
Seminole HS 5
Seminole HS 6
Seminole HS 1 3-4-25
Seminole HS 2 3-4-25
Seminole HS 3-4-25 3
Seminole HS 3-24-25 1
Seminole HS 3-24-25 3
Seminole HS 3-24-25 2
Seminole HS 3-24-25 4
Seminole HS 3-31-25 1
Seminole HS 3-31-25 2
Seminole HS 3-31-25 3
Seminole HS 3-31-25 4
Seminole HS 3-31-25 5
Seminole HS 4-7-25 1
Seminole HS 4-7-25 2
Seminole HS 4-7-25 3
Seminole HS 5-1-25 2
Seminole HS 5-1-25 1
Seminole HS 5-1-25 3
Seminole HS 5-1-25 4
Seminole HS 5-5-25 2
Seminole HS 5-5-25 1
Seminole HS 5-5-25 3
Seminole HS 5-5-25 4
Seminole HS 5-12-25 3
Seminole HS 5-12-25 2
Seminole HS 5-12-25 1
Seminole HS 5-12-25 4
Seminole HS 5-12-25 5
Seminole HS 5-20-25 1
Seminole HS 5-20-25 3
Seminole HS 5-20-25 2
Seminole HS 5-20-25 4
Seminole HS 5-27-25 3
Seminole HS 5-27-25 2
Seminole HS 5-27-25 1
Seminole HS 5-27-25 4
Seminole HS 5-27-25 6
Seminole HS 6-2-25 3
Seminole HS 6-2-25 1
Seminole HS 6-2-25 2
Seminole HS 6-2-25 4
Seminole HS 6-2-25 5
Seminole HS 6-2-25 6
Seminole HS 6-10-25 3
Seminole HS 6-10-25 1
Seminole HS 6-10-25 2
Seminole HS 6-18-25 1
Seminole HS 6-18-25 3
Seminole HS 6-18-25 2
Seminole HS 6-18-25 4
Seminole HS 6-18-25 5
Seminole HS 6-23-25 3
Seminole HS 6-23-25 1
Seminole HS 6-23-25 2
Seminole HS 6-23-25 4
Seminole HS 6-23-25 5
Seminole HS 6-23-25 6
Seminole HS 7-8-25 2
Seminole HS 7-8-25 1
Seminole HS 7-8-25 3
Seminole HS 7-8-25 4
Seminole HS 7-14-25 2
Seminole HS 7-14-25 3
Seminole HS 7-14-25
Seminole HS 7-21-25 2
Seminole HS 7-21-25 1
Seminole HS 7-21-25 3
Seminole HS 7-28-25 1
Seminole HS 7-28-25 3
Seminole HS 7-28-25 2
Seminole HS 7-28-25 4
Seminole HS 7-28-25 5
DJI_0001
DJI_0007
DJI_0040
DJI_0019
DJI_0024
DJI_0028
Seminole HS 8-11-25 3
Seminole HS 8-11-25 2
Seminole HS 8-11-25 1
Seminole HS 8-11-25 4
Seminole HS 8-11-25 5
Seminole HS 8-11-25 6
Seminole HS 8-18-25 3
Seminole HS 8-18-25 1
Seminole HS 8-18-25 2
Seminole HS 8-18-25 5
Seminole HS 8-18-25 4
Seminole HS 8-18-25 6
Seminole HS 8-25-25 1
Seminole HS 8-25-25 3
Seminole HS 8-25-25 2
Seminole HS 8-25-25 4
Seminole HS 8-25-25 6
Seminole HS 8-25-25 5
Seminole HS 9-2-25 2
Seminole HS 9-2-25 3
Seminole HS 9-2-25 1
Seminole HS 9-2-25 4
Seminole HS 9-2-25 5
Seminole HS 9-2-25 6
Seminole HS 9-8-25 1
Seminole HS 9-8-25 2
Seminole HS 9-8-25 3
Seminole HS 9-8-25 5
Seminole HS 9-8-25 4
Seminole HS 9-8-25 6
Seminole HS 9-15-25 2
Seminole HS 9-15-25 1
Seminole HS 9-15-25 3
Seminole HS 9-15-25 4
Seminole HS 9-15-25 5
Seminole HS 9-15-25 6
Seminole HS 9-26-25 1
Seminole HS 9-26-25 2
Seminole HS 9-26-25 3
Seminole HS 9-26-25 4
Seminole HS 9-29-25 2
Seminole HS 9-29-25 3
Seminole HS 9-29-25 1
Seminole HS 9-29-25 5
Seminole HS 9-29-25 6
Seminole HS 9-29-25 4
Seminole HS 9-29-25 7
A crane lifts a metal object against a clear blue sky, with buildings visible in the background.
The image depicts a dimly lit industrial or commercial interior space, with exposed ventilation ducts and pipes running along the ceiling, and a ladder visible in the background.
A construction site with a crane and workers in the foreground, surrounded by buildings and a clear blue sky in the background.
The image shows the interior of a partially constructed building, with a metal frame structure and large windows providing a view of the exterior landscape.
The image shows a partially constructed building interior with exposed steel beams and a worker on a lift platform, against a backdrop of a clear blue sky.
A large green construction vehicle stands in the foreground, with a tall metal structure and a clear blue sky in the background.
The image shows a partially constructed interior space with metal framing and concrete walls, with a person visible in the background.
A partially constructed interior space with exposed ceiling beams, ladders, and various construction materials scattered throughout the room.
A metal framework structure with angled beams and panels against a clear blue sky.
The image depicts a large indoor space with a high ceiling and exposed wooden beams and metal supports, creating a visually interesting and industrial-style architectural design.
The image shows a metal roof structure with wooden beams and exposed pipes or wires hanging from the ceiling.
A dimly lit industrial space with metal shelving and various tools and equipment scattered throughout the foreground.
A large, open industrial space with high ceilings, exposed beams, and various equipment and machinery visible throughout the room.
A yellow awning covers the entrance of a building, with scaffolding and construction materials visible in the background.
A large, open indoor space with a grid-like ceiling structure and various lighting fixtures, suggesting a commercial or industrial setting.
A large, white, rectangular structure suspended from the ceiling of a dimly lit industrial space, with various pipes, wires, and other equipment visible in the background.
The image shows a room with a pink ceiling, exposed ductwork, and a doorway visible in the background.
The image shows a large industrial fan and air conditioning unit mounted on the ceiling of a warehouse or industrial space, with a purple-colored wall in the background.
The image shows a partially constructed indoor space with exposed beams, pipes, and construction materials in the foreground, suggesting an ongoing renovation or construction project.
The image shows a construction site with a partially built wall, a ladder, and various construction materials in the foreground.
A large, open warehouse-like space with various furniture and home decor items displayed throughout, including shelves, cabinets, and other furnishings.
The image shows a metal ceiling structure with intersecting beams and supports, creating a grid-like pattern against a gray background.
A cluttered industrial workspace with metal shelves, tools, and various equipment visible in the foreground and background.
A dimly lit concrete stairwell with scattered debris and a phone on the floor.
The image shows a cluttered industrial space with various pipes, ducts, and equipment visible overhead, along with a purple-painted wall in the foreground.
A large, gray metal storage unit with multiple compartments stands in a dimly lit industrial setting, surrounded by various equipment and supplies.
The image shows a modern, minimalist interior space with large glass windows and doors, a concrete floor, and a black metal frame structure.
A dimly lit hallway with a closed door and various objects scattered on the floor, suggesting a state of disrepair or neglect.
The image depicts a glass and metal structure, with a grid-like pattern of panes and frames, creating a sense of depth and perspective. The background appears to be a dimly lit interior, suggesting this structure may be part of a larger building or facility.
New Cafeteria
Construction
Construction
Aluminum Construction
Front Office Renovations
Floor Construction
Classroom Renovations
A concrete structure with angled columns in the foreground is under construction, with scaffolding and building materials visible in the background.
Construction workers operate excavators and dump trucks amidst a sandy construction site with a modern building in the background under a cloudy sky.
A red ladder stands in the foreground of a hallway under construction, with exposed pipes and a skylight visible in the background.
A cluttered rooftop with debris and pipes in the foreground is set against a background of large green louvred vents on a building.
School Canopy
School Cafeteria Building
School Courtyard Canopy
Building Construction
New School Cafeteria
Building Construction
Wall in construction
New School Cafeteria
New Canopy
Ceiling in construction
A brightly lit modern hallway with exposed ceiling infrastructure in the foreground and a green trash bin and doors in the background.
A bucket of grout sits on a concrete floor in the foreground, with a partially tiled floor and a white pipe visible in the background.
Workers in hard hats stand amidst construction materials under a white canopy structure with a blue sky and distant buildings in the background.
In the foreground, ladders and construction materials are visible, while the background features a large window and exposed ceiling infrastructure.
A large metal beam extends across the foreground, with a crane hook hanging in the background against a cloudy sky above a building.
A large open gate reveals a trench dug in the foreground, with a building and trees visible in the background.
In the foreground, a large window with dark frames looks out onto a bright, overcast day, while the background reveals exposed pipes and ductwork on the ceiling of an unfinished room.
A yellow bulldozer sits on a gravel road next to large piles of dirt, with a row of white buildings in the background under a clear blue sky.
A yellow vapor barrier covers the foundation of a construction site, with a concrete wall and trees in the background under a cloudy sky.
A large, industrial cooling tower with a yellow ladder leading up to it stands in the foreground, with light-colored buildings and a blue sky with clouds in the background.
A modern building with large windows in the foreground is set against a bright orange ceiling and a cloudy sky in the background.
Construction materials like wooden pallets are scattered across the sandy foreground, with unfinished buildings forming the background.
Freshly poured concrete in the foreground leads to a building under construction with vehicles and construction materials in the background.
A concrete slab foundation sits on a mound of sand in the foreground, with a tall concrete wall and trees under a cloudy sky in the background.
A trash can and ladder are in the foreground of a long, tiled hallway under construction, with workers visible in the background.
In the foreground, construction materials like stacked boxes and ladders are visible, while the background shows a long hallway with exposed pipes and workers.
Two doors stand in a hallway, one open to reveal a room with windows and boxes, while the other is closed.
A wet concrete walkway leads to a modern building with green and white sections, surrounded by construction materials and yellow tarps.
A tall street lamp stands in the foreground of a construction site with a pile of dirt to the left and a building in the background under a clear blue sky.
A dark doorway opens to a sunlit yard with trees and buildings, while the foreground shows a concrete wall and a ladder.
A spacious, empty classroom with a dark patterned carpet in the foreground and a light green wall with whiteboards and a clock in the background.
A construction worker in a yellow vest rakes the floor in the foreground, while the background shows a long hallway covered in protective sheeting.
A concrete walkway leads between white buildings with covered walkways under a clear blue sky.
Two orange and white traffic cones stand on a paved road leading towards a white building under a clear blue sky, with construction fencing and trees in the distance.
A large, empty room with a dark patterned carpet in the foreground and a white wall with a door and a small table in the background.
A large digital sign for Seminole High School stands in the foreground, with a wet parking lot and distant trees under a cloudy sky in the background.
In the foreground, a blue ladder with a bucket and brushes sits on a light-colored floor, while in the background, workers on ladders paint a long, brightly lit hallway.
A modern building with large windows stands to the right, while a paved walkway and gravel area with lampposts occupy the foreground, and a concrete wall with trees and a cloudy sky form the background.
A freshly poured concrete walkway leads past a green fence and building, with a person walking in the distance on a paved area.
Freshly paved asphalt fills the foreground, leading to a large, light-colored building surrounded by a concrete wall under a cloudy sky in the background.
A long, brightly lit school hallway with green doors on the left and a dimly lit, vanishing point in the distance.
A silver car is parked in a handicapped spot in the foreground, with a motel and a large billboard visible in the background.
A man in a yellow vest operates a lawnmower on artificial turf in the foreground, with a building and trees in the background.
Construction materials and equipment, including a ladder and wheelbarrows, are scattered across the unfinished floor of a building with exposed ductwork and lighting in the background.
A young tree stands in a mulched bed in the foreground, with a modern building and parking lot stretching into the background under a cloudy sky.
A row of small, leafy green bushes lines the sandy foreground in front of a modern building with large, reflective windows in the background.
A partially disassembled drop ceiling with exposed ductwork and lighting is visible above a room with yellow walls, a television, and large windows.
A floor scrubber operates on a damaged hallway floor littered with debris, flanked by rows of blue lockers.
Demolition debris litters the foreground of a construction site, with a concrete saw visible behind a blue construction fence and trees in the background.
Metal studs and debris fill the foreground, while a person in a yellow vest works behind a white tarp in the background.
A paved walkway leads past a stop sign and a modern building under a cloudy blue sky.
A freshly cut trench runs through a concrete floor in the foreground, with construction materials and a person visible in the background.
Debris-strewn floors and exposed ceiling structures fill the foreground of a room with large windows and a partially finished wall in the background.
Construction workers are in a room with exposed insulation on the walls, concrete floors, and scaffolding in the foreground.
A metal ladder stands beside a concrete wall in the foreground, while the background reveals a partially demolished room with wet concrete on the floor.
A small white and red excavator sits in the foreground on a wet asphalt surface, with a blue construction barrier and a pile of sand behind it, all under a cloudy sky with palm trees in the distance.
A tall orange ladder stands in the foreground of a long, empty hallway with white walls and a tiled floor, leading to a dimly lit background.
Two white pipes stand in the foreground against a background of cinder block walls with electrical conduits and metal panels.
In the foreground, construction materials lean against a wall, while in the background, a yellow metal structure stands under a ceiling with exposed pipes.
A tall flagpole with an American flag stands in the foreground, with cars and a stop sign visible, against a cloudy sky in the background.
In the foreground, a yellow vapor barrier covers the floor with plumbing pipes protruding, while the background reveals unfinished walls with exposed studs and insulation.
A red stop sign stands at the edge of an asphalt lot in the foreground, with a tall, light-colored wall and a building in the background under a cloudy sky.
Corrugated metal roofing and exposed steel beams form the ceiling in the foreground, with a glimpse of industrial lighting and ductwork in the background.
A concrete enclosure with a metal roof stands in the foreground, with a modern building and cloudy sky in the background.
A concrete structure sits in a deep excavation, with an excavator arm reaching into the dirt behind it, and a construction fence visible in the background.
Concrete pillars stand over blue-covered holes in a dusty construction site, with insulation visible on the walls in the background.
Large open doorways reveal a blue fence and trees in the background, with a rough ground surface in the foreground.
A white wall with several electrical boxes and exposed wires is in the foreground, while a ladder and construction workers are visible through an open doorway in the background.
A concrete structure with pipes is in the foreground, with a road and a white fence in the background.
Exposed metal beams and ductwork form the ceiling structure in the foreground, while the background reveals a dimly lit interior with windows.
In the foreground, construction debris and concrete blocks litter the floor, while the background reveals exposed cinder block walls with plumbing pipes.
In the foreground, HVAC ducts are wrapped in plastic, while the background reveals exposed ceiling beams and conduits.
Metal beams and corrugated roofing form the unfinished ceiling in the foreground, while the background reveals a dimly lit interior with visible structural elements.
A dirt ground sits in the foreground before a white building with large glass windows and a blue fence under a clear blue sky.
An empty concrete room under construction features large glass windows in the foreground and exposed ceiling ducts and a ladder in the background.
A row of tan-colored utility panels and conduits lines a concrete floor against a wall with windows.
A construction worker in a yellow safety vest stands in the foreground of a building site with metal framing and a corrugated ceiling in the background.
White concrete blocks and debris sit in the foreground of a room with a white PVC pipe running against a grey cinder block wall.
Metal framing and piping are installed in the foreground against a background of a room with a purple wall and tiled floor.
A construction worker in a high-visibility shirt stands on a ladder against a tiled wall inside a building under renovation.
A worker stands on scaffolding beneath a large, curved metal ceiling frame inside an industrial building with an exposed roof structure.
A purple wall with a rectangular cutout and a small table stand in the foreground, set against large windows overlooking a bright outdoor scene.
Black pipes and electrical conduits run across a structural steel frame beneath a corrugated metal ceiling.
A purple drywall partition and a blue trash bin sit in the foreground of a white-walled room with a ladder on the floor.
A large metal pipe extends across a flat, dark industrial surface toward a construction area with tripods and equipment in the background.
A worker on a ladder stands in a room with exposed ceiling ducts and purple wall panels.
A worker in a yellow safety vest stands in the foreground of a construction site featuring purple walls and a matching purple ceiling.
Insulated silver ductwork runs across the foreground beneath a dark, industrial metal ceiling structure.
A purple rectangular ventilation hood hangs from an industrial ceiling with exposed metal beams and insulation.
A fire alarm terminal cabinet and sign are mounted on a red wall, situated between a grey door and a white tiled wall.
A smooth, grey concrete slab fills the foreground, bordered by a yellow caution tape and a white wall in the background.
A purple and white structural soffit is being installed in a commercial space with exposed ceiling joists and construction workers in the background.
Insulated silver HVAC ductwork runs across the foreground beneath an exposed industrial ceiling with metal beams and wiring in the background.