Facilities Design and Construction (FD&C)
Page Navigation
- Facilities Design & Construction (FD&C)
- Staff and Organizational Chart
- PAE Handbook and Design Criteria
- School Ed Specs
- Building Permit Application
- Current Major Building Projects
-
Completed Projects
- 2019 Cypress Woods Elementary School
- 2019 Lakewood High School
- 2020 Melrose Elementary School
- 2020 Pinellas Park Middle School
- 2020 Tarpon Springs High School
- 2021 North Shore Elementary School
- 2021 Northeast High School
- 2021 Richard O. Jacobson Technical High School at Seminole
- 2021 San Jose Elementary School
- 2021 Sanderlin IB K-8 School
- 2021 Sawgrass Lake Elementary School
- 2021 Shore Acres Elementary School
- 2022 Coachman Service Center
- 2022 Orange Grove Elementary School
- 2022 St. Petersburg High School
- 2023 Clearwater High School
- 2023 Lakewood High School
- 2023 Mangrove Bay Middle School
- 2023 Midtown Academy
- 2023 Mildred Helms Elementary School
- 2023 Pinellas Central Elementary School
- 2023 Seventy-Fourth St. Elementary School
- 2023 Tyrone Middle School
- 2024 Gibbs High School
- 2024 Gulf Beaches Elementary School
- 2024 Sandy Lane Elementary School
10 00 00 Specialties
-
10 73 26.13 Walkway Coverings Aluminum Covered Walkways
10 73 26.13 Walkway Coverings Aluminum Covered Walkways.docx 33.33 KB (Last Modified on March 1, 2019) -
10 73 33.02 Detail B 48 lines x 160 columns two sided
10 73 33.02 Detail B 48 lines x 160 columns two sided.pdf 146.14 KB (Last Modified on November 5, 2024) -
10 73 33.04 Detail D 64 lines x 192 columns two sided
10 73 33.04 Detail D 64 lines x 192 columns two sided.pdf 130.36 KB (Last Modified on November 5, 2024) -
10 73 33.06 Detail F 96 lines x 256 columns two sided
10 73 33.06 Detail F 96 lines x 256 columns two sided.pdf 131 KB (Last Modified on November 5, 2024) -
10 73 33.07 Detail G 64 lines x 192 columns wall mount
10 73 33.07 Detail G 64 lines x 192 columns wall mount.pdf 621.51 KB (Last Modified on November 5, 2024)