Facilities Design and Construction (FD&C)
Page Navigation
- Facilities Design & Construction (FD&C)
- Staff and Organizational Chart
- PAE Handbook and Design Criteria
- School Ed Specs
- Building Permit Application
- Current Major Building Projects
-
Completed Projects
- 2019 Cypress Woods Elementary School
- 2019 Lakewood High School
- 2020 Melrose Elementary School
- 2020 Pinellas Park Middle School
- 2020 Tarpon Springs High School
- 2021 North Shore Elementary School
- 2021 Northeast High School
- 2021 Richard O. Jacobson Technical High School at Seminole
- 2021 San Jose Elementary School
- 2021 Sanderlin IB K-8 School
- 2021 Sawgrass Lake Elementary School
- 2021 Shore Acres Elementary School
- 2022 Coachman Service Center
- 2022 Orange Grove Elementary School
- 2022 St. Petersburg High School
- 2023 Clearwater High School
- 2023 Lakewood High School
- 2023 Mangrove Bay Middle School
- 2023 Midtown Academy
- 2023 Mildred Helms Elementary School
- 2023 Pinellas Central Elementary School
- 2023 Seventy-Fourth St. Elementary School
- 2023 Tyrone Middle School
- 2024 Gibbs High School
- 2024 Gulf Beaches Elementary School
- 2024 Sandy Lane Elementary School
-
Sandy Lane Elementary - Campus Remodel
Project Information:
Architect: FleishmanGarciaMaslowski Architecture
Contractor: Ajax Building Company
PCS Project Coordinator: Javier Perez
Project Budget: 14.2 million
Start Date: May 2023
Completion: August 2024
Construction/Remodel:
The project includes remodeling the existing Sandy Lane Elementary School campus which houses the Conservatory for the Arts.
Exterior Improvements:
• Enhance the front entrance and arrival drop off area for visitors. This will include re-working the existing parking lot layout.
• Re-locate the existing bicycle rack to accommodate a new parking lot layout
• Reseal exterior brick
• Repair any stucco and repaint exterior stucco banding and soffit areas and roof replacement
• Install new program specific playground equipment
Permanent Walls:
• Demolish existing Haueserman and cubicle partitions
• Install new metal framing for walls from floor to roof deck
• Insulate new walls from floor to roof deck
• Install drywall from floor to roof deck and finish
• Fire rate all penetrations through rated walls
• Install new interior doors, frames and hardware
• Interior paint
• Install power in new walls
• Install data drops in new walls
• Install Voice over IP system throughout
• Install marker boards and tack boards in classrooms
• Modify existing fire alarm system in new walls
• Install panic button system throughout
• Install new clock system throughout
• Install new FISH numbering system throughout
• Install new storefronts and doors
• Remove, store and reinstall security cameras throughout
Casework:
• Install casework in classrooms
• Install sinks in casework
• Provide water supply and cut and patch floors for drainage for sinks
• Provide roof penetrations for vent stacks
• Install five-foot-high walls with new bookshelves and countertops in the Media Center to provide separation from adjoining spaces
HVAC:
• Relocate existing VAV’s to accommodate new walls
• Install fire dampers throughout
• Install a completely new return air duct system throughout
• Demolish existing ceilings and lights and replace lights with LEDs throughout
• Provide automatic lighting control throughout
• Test and balance of the system will be provided by the owner
Flooring:
• Remove existing flooring throughout and replace it with new
Administration Suite:
• Create new front lobby and administration suite
• New conference room adjacent to the administration suite larger enough for staff meetings
Project Status:
Week of 9/6/24
- In closeout