• Sandy Lane Elementary - Campus Remodel

     

    Project Information:

    Architect: FleishmanGarciaMaslowski Architecture

    Contractor: Ajax Building Company

    PCS Project Coordinator: Javier Perez

    Project Budget: 14.2 million

    Start Date: May 2023

    Completion: August 2024

     

    Construction/Remodel:

    The project includes remodeling the existing Sandy Lane Elementary School campus which houses the Conservatory for the Arts. 

     

    Exterior Improvements:

    • Enhance the front entrance and arrival drop off area for visitors.  This will include re-working the existing parking lot layout.

    • Re-locate the existing bicycle rack to accommodate a new parking lot layout

    • Reseal exterior brick

    • Repair any stucco and repaint exterior stucco banding and soffit areas and roof replacement

    • Install new program specific playground equipment

     

    Permanent Walls:

    • Demolish existing Haueserman and cubicle partitions

    • Install new metal framing for walls from floor to roof deck

    • Insulate new walls from floor to roof deck

    • Install drywall from floor to roof deck and finish

    • Fire rate all penetrations through rated walls

    • Install new interior doors, frames and hardware

    • Interior paint

    • Install power in new walls

    • Install data drops in new walls

    • Install Voice over IP system throughout

    • Install marker boards and tack boards in classrooms

    • Modify existing fire alarm system in new walls

    • Install panic button system throughout

    • Install new clock system throughout

    • Install new FISH numbering system throughout

    • Install new storefronts and doors

    • Remove, store and reinstall security cameras throughout

     

    Casework:

    • Install casework in classrooms

    • Install sinks in casework

    • Provide water supply and cut and patch floors for drainage for sinks

    • Provide roof penetrations for vent stacks

    • Install five-foot-high walls with new bookshelves and countertops in the Media Center to provide separation from adjoining spaces

     

    HVAC:

    • Relocate existing VAV’s to accommodate new walls

    • Install fire dampers throughout

    • Install a completely new return air duct system throughout

    • Demolish existing ceilings and lights and replace lights with LEDs throughout

    • Provide automatic lighting control throughout

    • Test and balance of the system will be provided by the owner

     

    Flooring:

    • Remove existing flooring throughout and replace it with new

     

    Administration Suite:

    • Create new front lobby and administration suite

    • New conference room adjacent to the administration suite larger enough for staff meetings

     

    Project Status:

    Week of 9/6/24

    • In closeout