2021 St. Petersburg High - Major Renovations Campus Wide

  • Updated 11/9/21

    Project information:

    Architect: Rowe Architects, Inc.

    Contractor: Creative Contractors, Inc.

    PCSB Project Manager: Rich Gauvey

    Project Budget: $33 Million

    Start Date: June 2019

    Completion: August 2021

     

    Construction/Renovation of:

    • Major renovations campus wide to create cafeteria, art room and band room. 
    • Demolish Existing Buildings 2, 3, and 8.
    • Create a new covered entrance from the west visitor’s parking lot to the front entrance of the school parallel to 5th Ave. 
    • Create a new courtyard where buildings 2 and 3 were demolished.
    • New ticket booth/concession stand/restroom building to be an estimated 1,500 square feet

    Renovations to include:

    • Stucco Repairs as needed throughout campus
    • Painting (interior & exterior) Enhance the trim of Building 1 to a different color than the base color of the walls
    • Tuck-pointing As needed
    • Roof replacement:  Building 1 all modified roofs to be replaced.
      • Building 4 replace modified roof to the deck and replace the tile roof.
      • Building 5 replace the tile roof
    • Line domestic water lines in Building 1
    • Replacement of exhaust fans in Building 5
    • Replace Trane water cooled Chiller
    • Replace 2 fresh air handling units in Building 5
    • Replace rooftop air handler in Building 1.
    • Provide strip heaters for Buildings 1 & 4
    • Replacement of existing air handler units with new vertical fan coil units in Building 1 & 4
    • Replace chiller serving Buildings 1 & 4 and associated pumps and cooling tower
    • New ceilings and lights in Buildings 1 & 4
    • New low voltage/technology infrastructure  (access control, network, phones, intrusion and cameras) throughout campus
    • New fire alarm system throughout campus
    • Install new Fire sprinkler and fire pump throughout campus
    • Repair all termite damage throughout Building 1
    • Repair fire barriers in attic of Building 1.
    • Securing school entrance:
      • Renovate existing administration office suite to enclose existing open entrance vestibule and create a visitors waiting area and secured sign in area.
    • Replace counter tops and sinks in Building 4 restrooms
    • Auditorium:
      • Enhance the trim to a different color than the base color of the walls
      • Replace carpeting and stain floor under seats
      • Provide ADA seating
      • Replace rear entry doors to the seating area
    • Small auditorium in Building 1: replace flooring, lights, and enhance the trim to a different color than the base color of the walls.
    • Building 1 Carpet
    • Site work
    • Building 1 hallways:
      • Replace metal screening with windows, remove abandoned conduits, and restore painted brick base to original brick color.

    Project status:

    Week of 11/9/21

    Working on exterior east elevation of Builing 4 envelope.

    Sidewalks on the east side of courtyard adjucent to Building 4.

    Courtyard landscape/hardscape

    Project substantial completion is set for December 4. 2021.